Project: phowe   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1711.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Jun 03, 2021     Installed gap seal left wing - (11 hours)       Category: Wings
Installed the gap seal on the left wing. This included match drilling after trying to make it have the same angle as the wing skin. we had a heck of a time. We used the hand seamer to crimp it. I was a little overzealous on flap seal and dented the bottom a bit. where the 2 meet in the middle didn't line up like we wanted. When we disassembled to debur Brenden a dimple remover tool to get some of my dents out. After we reassembled we riveted the remaining wing skin rivets and the gap seal under the wing skin and also to the rear spar. We then checked for clearance. Brenden used a ball peen hammer, per the instructions, and creased the underside so the flap would clear. He was no happy on how hat looked, but the flap cleared.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.